Quoting: ianjpage
how come they not going to plan then?
Originally I was planning to ship to the docks at Long Beach via MTS, then let Stromberg deal with the shipping to the U.K . . .
This was because the guy they normally use was looking to be cheaper . . . alas, when it came to the crunch, their usual guy wasn't shipping anything. I held it up by adding the brakes and ended up missing the next container. When it was ready to go the normal guy didn't have anything and the other person they lined up would've worked out more.
So I went back to Marty and asked him to get a quote . . . he's now dealing with the shipping from his workshop straight to Stromberg's doorstep !
Quoting: Cunning Plan
Not quite my thing.
Pfft. No taste.
Anyway - <drum roll>
The engine and gearbox (and brakes) should be being picked up from MTS today . . . I should have some tracking details shortly.
I always said I wouldn't actually start the Caddy until I had the Engine, Trans, Brakes and Suspension bought.
At the moment I have 3 out of 4 . . . although there's still the intake and carbs required for the motor . . .
I really do need to push the sale of the Pig to free up some funds. The bill that I've been left with will mean spare funds, otherwise, simply won't exist for a year or two.
Still.
It'll be worth it.