Got a few hours in yesterday with the help of Ian . . . I'm at a stage now where I need to get stuff laser-cut and fabbed up . . . Our workshop is totally rammed so I reckon there'll be quite a wait involved . . .
Still, lots of things off the list :
Updated :
* Buy / Replace battery (purchase lined up for this month) * Buy / install (exterior) battery kill switch (purchase lined up for this month) * Remove existing exhaust system (long story - I think I've explained ?) * Measure up for new pipes / design new stubby pipes *
Buy / make remaining bits needed for exhaust (
bends, straights & flanges)
* TiG together and install
* Fit Sensors to exhaust,
run wiring inside of car * Install both controllers inside car in accessible position, wire up * Remove D/S A-pillar cover, test fit new triple-pod pillar, test fit gauges * Install 2 x A/F gauges, 1 x vac gauge to pods, run lines, install pillar * Replace manual fuel pressure gauge under bonnet with take-off * Install fuel pressure gauge in car, run lines to take-off and wire up * Remove clutch pedal, mark up for cutting (it's never been right) * cut/weld clutch pedal, paint and replace
* Remove rear harness points *
Design and make strengthened harness points
* Paint and replace
* Trim (and cap) bolts protruding on the underside of car (under seats) * POR15 missed areas under wheel arches
* Front wheel liners (what to do)
* Repair hood (I'll need to have a strengthening plate made, too)
* Respray hood (got the paint already)
* Investigate gauges (some behave oddly)
That's all I can think of for now . . . . Oh, yeah -
* Time / tune
* MoT & Tax
* Try not to crash it !!