Well, winter's over and soon the Camaro will be moved outside so work can continue with the garage extension.
All's been well over winter, no leaks or signs of damp areas so I'm happy.
The next two jobs are to finish the "long wall" and install the "mezz-floor" in the new section.
Although the floor will clear
aload of materials out of the way it's also a very expensive job so I'll probably opt to do the wall first . . . hence I've just ordered some 150 x 8 mm flat steel bar to produce a bracket which is required for me to be able to acheive what I'm after.
I'm hoping to get the 'Maro out this weekend - but it'll depand on both the weather and the progress of parts from the states (as yet not everything is with Carl, so nothing is going anywhere at the mo).